WEIERYANG — Sculpture fabrication & packing photo request Source: https://weieryangart.com/process/#oem-fabrication-records BLANK BUYER REQUEST Use this shot list to request photographs and supporting records against a defined object, drawing revision and project-specific question. Select only applicable stages. Leave unknown items blank and agree them with the project team. This is not a drawing approval, inspection certificate, acceptance record, supplier quotation or record of completed work. Downloading does not submit an inquiry. PROJECT REFERENCES Project / artwork reference: Current drawing / revision: Units for measurement views: Requested file format / identification method: Project contact / role: 1. OVERALL FORM AND IDENTIFICATION Choose overall and detail views that identify the work or component. Specify which object label or drawing reference should accompany the image. Include in this request: Artwork / component and drawing revision: Required views / record method: Project team's criterion or question: Received-file / record reference: Supporting document requested / reference: Reviewer / date: Unresolved item / next question: 2. SURFACE OR SAMPLE COMPARISON Choose representative surface areas, the sample or reference to compare, and the lighting context to record. State whether a physical sample or separate finish document is also required. Include in this request: Artwork / component and drawing revision: Required views / record method: Project team's criterion or question: Received-file / record reference: Supporting document requested / reference: Reviewer / date: Unresolved item / next question: 3. DIMENSIONS OR TRIAL FIT Choose the dimension locations or assembly interfaces to record, any scale reference and units, and the supporting measurement or trial-fit record. A photograph is not itself a measurement report. Include in this request: Artwork / component and drawing revision: Required views / record method: Project team's criterion or question: Received-file / record reference: Supporting document requested / reference: Reviewer / date: Unresolved item / next question: 4. CONDITION, PROTECTION AND PACKING Choose condition views before covering, protection and packing arrangement views before closing, and the closed package and identifier views relevant to your scope. Agree packing methods and handling documents separately. Include in this request: Artwork / component and drawing revision: Required views / record method: Project team's criterion or question: Received-file / record reference: Supporting document requested / reference: Reviewer / date: Unresolved item / next question: 5. ARRIVAL CONDITION If included in your agreed scope, choose package and work-condition views at receipt, identification and unresolved-condition records. Agree the receiving process separately. Include in this request: Artwork / component and drawing revision: Required views / record method: Project team's criterion or question: Received-file / record reference: Supporting document requested / reference: Reviewer / date: Unresolved item / next question: USING THIS REQUEST Copy relevant items into your project brief, or save them as a PDF using your editor for the existing attachment form. The website form does not accept TXT files. Nothing is sent automatically. Photographs alone do not confirm alloy grade, concealed structure or acceptance. Agree supporting documents and reviewers separately.